Skip to main content
%

Hünnebeck TOPEC

20048M

Floor formwork
770 sqm. Austria

Hünnebeck's TOPEC formwork makes working on site easier and faster. With the large 180x180 cm (3.24 m²) panels, you can form very quickly.

You only need two parts for the whole system: the panel and the support. This makes handling simple and efficient. The ECOPLY formlining is made of plastic and ensures excellent concreting results. It is easy to clean, has low wear and is equipped with countersunk rivets to extend its life and improve the quality of the concrete surface.

🔧⚙ This package also includes the N edge support, the 90 levelling beam and the 180 levelling beam.

Please note that these heavy duty accessories are unclassified, uncleaned and not currently ready for use.
📞 If you have any questions or require further information, please do not hesitate to contact us.

Partial quantity: possible Subject to prior sale

€  56,50  / sqm.

770 sqm.

Non-classified

Formwork & scaffolding in uninspected or non-operational but possible to recondition, therefore the products are not suitable for any applications due to the lack of safety.

Enquire now at your Form-on contact person

Product features

  • Used
  • Not suitable for any kind of application
  • Non-operational
  • Material: aluminium
  • Low weight

More about our quality levels.

You can find an overview of our quality levels here: New. Classified 3-star. 2-star. 1-star. Non-classified.

You would like to visit this offer?

Contact us and see for yourself what we have to offer. 

Package 20048M consists of

Qty SKU Description Weight Quality
232 PC 554000 TOPEC panel 180/180 45.58 kg
4 PC 548089 TOPEC panel 90/75 10.43 kg
18 PC 602678 Topec adjust panel 50x180 19.50 kg
47 PC 492806 TOPEC transverse beam 4.34 kg
77 PC 487880 TOPEC adjustment beam 90 3.60 kg
2 PC 487890 TOPEC adjustment beam 180 7.20 kg
127 PC 487673 TOPEC edge support N 1.70 kg